Portland Construction Highlight | Dec 16 2017
Construction Film · Portland · 2017
Portland Construction Highlight | Dec 16 2017
Construction Film · Portland · 2017
A one-minute Hellas Construction highlight from a December 2017 Portland job. Call 719-964-6971 or start a project with us.
Contact
Start A Project With Us
Tell us the date and what the files have to do. Fill out the form and we will reply.
Sports Construction Film
Portland, Texas Parks Highlight, December 16, 2017. The One-Minute Hellas Cut After Substantial Completion.
Film by Adam Grumbo
This one-minute highlight is dated December 16, 2017, three months after the city's September 15 substantial-completion date for the Hellas Design Build renovation of Portland, Texas Municipal Park and the Sports Complex.
The December 21, 2016 council award set a guaranteed maximum price of $16,567,446.25 for both parks. Hellas specified Matrix Turf with Geo Plus organic infill. The Synthetic Turf Council later named the two-park job its 2018 Sports Project of the Year.
The short cut is the finished fields from the air and a ceremony hold on the ground.
Who Hired The Camera
Contractors hire a one-minute recap when a completed bond job has to move in a social slot. This file is that December 2017 highlight.
What The Camera Held
Contact
Start A Project With Us
Tell us the date and what the files have to do. Fill out the form and we will reply.
An aerial looks across a two-tone turf diamond, blue outfield wall, metal light pole, and a white water tower toward the coastal flat. On the ground a man in a portland cap and light-blue shirt reads at a pair of microphones, matching shirts behind him, blue and green vertical panels at his back.
The stills are frames from the one-minute file.
What The Film Delivers
A finished sports park needs a short cut that can travel with the longer recaps. Sports-field teams hire us when the aerial and the ceremony have to fit one minute.
Book A Sports Construction Film
Start A Project or call 719-964-6971.